Publications

Title: Published Date: Category: Subject: Abstract: Number of Pages: View/Download: Related Documents:
Town of Brentwood Primary Amendment to the Boundary of Mixed-Use Town Center Zone Development Plans & Design Guidelines November 2000 Special Report The Development Plan, design process and guidelines containted herein establish a framework for
property owners, tenants, the local municipality, County officials and staff to review proposed new
development or redevelopment within the proposed Mixed Use Town Center boundary. The Development
Plan accompanies the Mixed-Use Town Center zone, which was recommended to replace the existing
zones within the designated boundary as part of the master planning process. The Planning Area 68
Master Plan and Sectional Map Amendment were approved and adopted on May 1 7, 1994. The Mixed-Use
Town Center Zone stipulates that regulations concerning the location, size and other provisions for
all buildings and structures in the zone are as provided in an approved Town Center Development
Plan. This document provides the following: a statement of intent, a brief introduction,
description of the preplanning steps, description and illustrations of the short- and long-range
development options, specific design principles and guidelines to guide development in the
implementation of the development plan options, description of the local design review process,
inventory of existing uses and street right-of-way widths, existing zoning and the M-U-TC Zone and
use list.
100